Bukaya-Butadhiba
Bukaya-Butadhiba is a locality in Kamuli District, Eastern Uganda and has an elevation of 1,064 metres. Bukaya-Butadhiba is situated nearby to the locality Bugaga-Busanga, as well as near the village Bugumira.| Tap on a place to explore it |
Places of Interest
Highlights include Isimba Hydroelectric Power Station.
Isimba Hydroelectric Power Station
Power station
Isimba Hydroelectric Power Station is a 183.2 megawatts hydroelectric power station commissioned on 21 March 2019 in Uganda. Construction of this dam began in April 2015 and was completed in January 2019. Commercial operations began on 21 March 2019.
Bukaya-Butadhiba
- Type: Locality
- Location: Kamuli District, Eastern Uganda, Uganda, East Africa, Africa
- View on OpenStreetMap
Latitude
0.79258° or 0° 47′ 33″ northLongitude
33.04948° or 33° 2′ 58″ eastElevation
1,064 metres (3,491 feet)Open location code
6GGMQ2VX+2QGeoNames ID
11552961
This page is based on GeoNames, Wikidata, and Wikimedia Commons.
We’d love your help improving our open data sources. Thank you for contributing.
Satellite Map
Discover Bukaya-Butadhiba from above in high-definition satellite imagery.
Localities in the Area
Explore places such as Bugaga-Busanga and Bugumira.
Notable Places Nearby
Highlights include Kituba and Simba Falls.
Eastern Uganda: Must-Visit Destinations
Delve into Jinja, Mbale, Soroti, and Tororo.
Curious Places to Discover
Uncover intriguing places from every corner of the globe.
About Mapcarta. Text is available under the CC BY-SA 4.0 license, except for photos, directions, and the map. Photo: Wikimedia, CC0.