Unfinished power house
Unfinished power house is an electrical supply store in Central Province, Zambia. Unfinished power house is situated nearby to main library, as well as near the pitch basket ball court.Places in the Area
Nearby places include Kabwe.
Kabwe
Photo: Flacourtophile, CC BY-SA 4.0.
Kabwe is the capital of the Zambian Central Province and the Kabwe District, with a population estimated at 288,598 at the 2022 census. Named Broken Hill until 1966, it was founded when lead and zinc deposits were discovered in 1902.
Unfinished power house
- Type: Electrical supply store
- Categories: house, building, and shop
- Location: Central Province, Zambia, Southern Africa, Africa
- View on OpenStreetMap
Latitude
-14.44423° or 14° 26′ 39″ southLongitude
28.4654° or 28° 27′ 56″ eastOpen location code
5GQCHF48+85OpenStreetMap ID
way 1226124306OpenStreetMap feature
building=detachedOpenStreetMap feature
shop=electrical
This page is based on OpenStreetMap, Wikidata, and Wikimedia Commons.
We’d love your help improving our open data sources. Thank you for contributing.
Satellite Map
Discover Unfinished power house from above in high-definition satellite imagery.
Notable Places Nearby
Highlights include main library and basket ball court.
Nearby Places
Explore places such as classes and lecture theatre.
Curious Electrical Supply Stores to Discover
Uncover intriguing electrical supply stores from every corner of the globe.