Cedar Point Wind Farm Lincoln County Substation
Cedar Point Wind Farm Lincoln County Substation is an electrical substation in Elbert, Colorado.- Electrical substation
- Category: industry
- Location
Key Facts
Latitude39.44864° or 39° 26′ 55″ north
Longitude-103.67939° or 103° 40′ 46″ west
Open location code85FRC8XC+F6
OpenStreetMap IDway 195463167
This page is based on…
We’d love your help improving our open data sources. Thank you for contributing.
Notable Places Nearby
Discover Walks Camp Cemetery and Walks Camp Park.
Nearby Places
Explore places such as Limon Wind Energy Center I Substation and Limon Wind Energy Center I-II-III.
Curious Electrical Substations to Discover
Uncover intriguing electrical substations from every corner of the globe.
“I am human, and I think nothing human is alien to me.”
Colorado: Highlights
Learn more about Denver and Colorado Springs.