Zhangjiakou Power Plant 500 kV Step-up Substation

Zhangjiakou Power Plant 500 kV Step-up Substation is an electrical substation in , . Zhangjiakou Power Plant 500 kV Step-up Substation is situated near .
  • Electrical substation
  • …is also known as “张家口电厂500千伏升压站”
  • …is operated by 大唐国际发电股份有限公司张家口发电厂

Places of Interest Nearby

Highlights include Zhangjiakou Power Station.
Power station
is situated 620 metres south of Zhangjiakou Power Plant 500 kV Step-up Substation.

Places in the Area

Nearby places include Chunguang.
Town
Township is a rural township located in , , , China. is situated 9 km east of Zhangjiakou Power Plant 500 kV Step-up Substation.

Zhangjiakou Power Plant 500 kV Step-up Substation

This page is based on OpenStreetMap, Wikidata, and Wikimedia Commons.
We’d love your help improving our open data sources. Thank you for contributing.
Latitude
40.66288° or 40° 39′ 46″ north
Longitude
114.94544° or 114° 56′ 44″ east
Open location code
8PGPMW7W+55
Open­Street­Map ID

Satellite Map

Discover this place from above in high-definition satellite imagery.

In Other Languages

From Chinese to Vietnamese—“Zhangjiakou Power Plant 500 kV Step-up Substation” goes by many names.
  • Chinese: “Zhāngjiākǒu Diànchǎng 500 qiānfú Shēngyāzhàn”
  • Russian: “Повышающая подстанция 500 кВ электростанции Чжанцзякоу”
  • Vietnamese: “Trạm nâng áp 500 kV Nhà máy điện Trương Gia Khẩu”

Hebei: Highlights

Learn more about Shijiazhuang and Tangshan.
“Tourists don’t know where they’ve been, travelers don’t know where they’re going.”