Cressing Solar Farm (Phase 1)
Cressing Solar Farm (Phase 1) is a power station in White Notley, Braintree District, England. Cressing Solar Farm (Phase 1) is situated near White Notley railway station, as well as near the house Fambridge Hall.- Power station
- …is operated by Octopus Investments
Places of Interest Nearby
Discover White Notley railway station and Cressing Temple.
White Notley railway station
White Notley railway station is on the Braintree…
1,400 feet west of Cressing Solar Farm (Phase 1)
Cressing Temple
JohnArmagh, Public domain.
Cressing Temple is a medieval site situated between…
2,400 feet east of Cressing Solar Farm (Phase 1)
Church of St Ethelreda
3,000 feet southwest of Cressing Solar Farm (Phase 1)
Places in the Area
Nearby places include Silver End and Tye Green.
Silver End
Silver End is a village and civil parish between Witham and Braintree, in Essex, England.
Perry Green
Locality
Perry Green is a hamlet in the civil parish…
2½ miles northeast of Cressing Solar Farm (Phase 1)
Cressing Solar Farm (Phase 1)
Key Facts
Latitude51.8387° or 51° 50′ 19″ north
Longitude0.60126° or 0° 36′ 5″ east
Open location code9F32RJQ2+FG
OpenStreetMap IDway 745132283
This page is based on…
We’d love your help improving our open data sources. Thank you for contributing.
Notable Places Nearby
Discover Fambridge Hall and Sheepcote Wood.
Nearby Places
Explore places such as Cressing Temple Barns and The Barns Tea Room.
Curious Power Stations to Discover
Uncover intriguing power stations from every corner of the globe.
“One’s destination is never a place, but rather a new way of looking at things.”
Essex: Highlights
Learn more about Colchester and Chelmsford.